🎯 Objective
To provide information to the user about the assignments that are to due in the next 7 natural days.
\uD83D\uDCCA Success metrics
Goal | Metric |
---|---|
The user obtains a list of the assignments that are next to close, segmented in blocks that can be clicked on. | The system is able to filter the assignments and show only the ones to be close in the next 7 natural days and present each one in its own block. |
Each block contains enough information as to identify the related assignment | The blocks contains:
|
Teachers are able to see how many students have submitted already. | The system shows, for each assignment, how many students have submitted the assignment against how many students had the assignment itself. |
\uD83E\uDD14 Assumptions
\uD83D\uDDD2 Requirements
Requirement | User Story | Importance | Jira Issue | Notes |
---|---|---|---|---|
HIGH |
\uD83C\uDFA8 User interaction and design
The widget shall present up to 7 full blocks of assignments, allowing to scroll the rest if needed.
If there are less than 7 assignments, the widget shall collapse in height until reaching the position in which the first block would start to appear.
On click/tap, each block redirects the user to the Edit Assignment popup, in the Assignments section, providing the required information to the module so it opens in the relevant assignment.
Open Questions
Question | Answer | Date Answered |
---|---|---|